POLARISHome&Plaza PROMOTIONAL OFFER
POLARIS Home&Plaza: full security of investments at the most favorable rate of 24.8 UAH / USD

Angelica Sahakyan, project manager POLARIS Home&Plaza, noted that the developers of the project are companies Perfect Group and Citex Development – have sufficient financial resources to ensure the smooth construction of the residential complex in accordance with the work schedule.

"Every day the construction is gaining momentum. And for those buyers who keep their savings in foreign currency, the proposed shares allow you to become the owner of an apartment with an additional benefit of up to 10% only on the exchange rate difference. In addition, buyers are guaranteed complete investment security, "she said. The number of apartments involved in the action is limited.

We will remind, the company Perfect Group and Сitex Development began completion of the frozen facility on the street. Kulzhenko family, 22, and the construction of a multifunctional residential complex. The area of land allocated for construction is 2.9 hectares. The construction customers are PE PE "Budinvestmontazh" and LLC "Gradobud 1". General contractor of construction: LLC "Budpidryad".

The residential complex will be built on a monolithic-frame technology with external duties and internal walls made of red solid brick and insulated with mineral wool. Delivery of the first stage of construction POLARIS Home & Plaza scheduled for the second quarter of 2022. The completion date of the entire project is the second quarter of 2023.

The residential complex will be built on a monolithic-frame technology with external duties and internal walls made of red solid brick and insulated with mineral wool. Delivery of the first stage of construction POLARIS Home & Plaza scheduled for the second quarter of 2022. The completion date of the entire project is the second quarter of 2023.

Object site: https://polaris.kiev.ua/

ЗАМОВИТИ ДЗВІНОК
Девелопери проекту:
The second stage of construction:
Section 4.1
  • 90% completed work on the construction of external, internal walls and partitions made of bricks and aerated blocks.
  • 90% completed work on the installation of PVC window and balcony blocks.
  • The floor screeds of the apartments have been completed in full.
  • The heating and water supply pipes in the floor are laid out 100%.
  • November 2025. Finishing of walls and installation of doors in technical premises have been completed.
  • Work on laying floor tiles is ongoing.
  • February 2026: Performance of work on the installation of mineral wool on the facade, installation of brackets for air conditioner baskets. Installation of water supply and heating systems.
  • March 2026: 35% of the installation of insulation with doweling of the main field has been completed. Application of the reinforcing layer with fiberglass mesh installation – 5% completed. Tightness testing of water supply and heating systems up to the 20th floor has been carried out. Pumps for the pump room have been delivered. Installation of external lightning protection outlets has been completed.
  • May 2026: • Facade insulation completed — 110 m². • Decorative plaster applied — 4,750 m². • Facade painting completed — 700 m². • Tile flooring installed in common areas from the 3rd to the 11th floor. • Works on the decorative finish layer of walls and ceilings are ongoing.
  • June 2026: Façade: insulation — 220.00 m², reinforcement — 413.41 m², decorative plaster — 770.00 m², painting — 1,075.00 m².
  • Квітень 2026: - виконано утеплення фасаду обсягом 450 м² та армування фасаду 1710 м², нанесення декоративної штукатурки 1500 м² та фарбування фасаду 235 м². - виконано оздоблення стін МЗК з 3 по 26 поверх і влаштування підлоги з плитки МЗК з 11 по 26 поверх.
  • Травень 2026: • Виконано утеплення фасаду — 110 м². • Нанесено декоративну штукатурку — 4750 м². • Пофарбовано фасад — 700 м². • Виконано влаштування підлоги з плитки в МЗК з 3 по 11 поверх. • Тривають роботи з влаштування декоративного шару стін та стель.
  • Червень 2026: фасад: утеплення — 220,00 м², армування, — 413,41 м², нанесення декоративної штукатурки — 770,00 м², фарбування — 1075,00 м²
Section 3.3
  • 100% completed work on the construction of the reinforced concrete frame of the house.
  • 75% completed work on the construction of external, internal walls and partitions made of bricks and aerated blocks.
  • 80% completed work on the installation of PVC window and balcony blocks.
  • November 2025. Finishing of walls and installation of doors in technical premises have been completed.
  • Work on laying floor tiles is ongoing.
  • February 2026: Performance of work on the installation of mineral wool on the facade, installation of brackets for air conditioner baskets. Installation of equipment for boiler room No. 1 and ITP No. 1.
  • March 2026: Vapor barrier of external window installation joints is 95% complete. 15% of the facade insulation installation with doweling of the main field has been completed. Installation of equipment in ITP No.1 has been completed; the equipment is being prepared for testing. Installation of boiler house equipment No.1 is ongoing. Delivery of apartment entrance doors is ongoing.
  • May 2026: • Facade insulation completed — 150 m². • Facade reinforcement completed — 250 m². • Decorative plaster application completed — 450 m². • Facade painting completed — 275 m². • Plastering of common area walls from the 3rd to the 11th floor completed. • Installation of apartment and technical doors from the 3rd to the 26th floor is 90% complete.
  • June 2026: Façade: insulation — 23.06 m², reinforcement — 90.00 m², decorative plaster — 950.00 m², painting — 1,280.00 m². water supply and heating manifolds installed shut-off valves installed for apartment water supply and heating systems control valves installed for the fire protection system cable tray installation started on Floors 1–2 "American" wall plastering completed on Floors 3–26 waterproofing of cold transition areas completed on Floors 3–26 tiling completed on Floors 18–26
  • Березень 2026: - на 95% готова пароізоляція зовнішніх монтажних швів вікон. - готово 15% монтажу утеплювача з дюбелюванням основного поля фасаду. - закінчено монтаж обладнання в ІТП №1, обладнання готують до випробувань. Триває монтаж обладнання котельні №1. - триває поставка квартирних дверей.
  • Квітень 2026: - виконано утеплення фасаду площею 1020 м², армування 1700 м², нанесення декоративної штукатурки 780 м² та фарбування 600 м². - виконано штукатурку стін МЗК з 12 по 26 поверх. - здійснено монтаж гребінок водопостачання, встановлення запірної та регулювальної арматури стояків опалення та водопостачання, а також монтаж виводів опалення у ліфтову зону.
  • Травень 2026: • Виконано утеплення фасаду — 150 м². • Армування фасаду — 250 м². • Нанесення декоративної штукатурки — 450 м². • Фарбування фасаду — 275 м². • Виконано штукатурення стін МЗК з 3 по 11 поверх. • Монтаж квартирних та технічних дверей з 3 по 26 поверх виконано на 90%.
  • Червень 2026: фасад: утеплення — 23,06 м², армування — 90,00 м², нанесення декоративної штукатурки — 950,00 м², фарбування — 1280,00 м² змонтовано гребінки водопостачання та опалення встановлено запірну арматуру на квартири водопостачання й опалення встановлено регулюючу арматуру системи пожежогасіння розпочато монтаж кабельних лотків на 1–2 поверхах виконано штукатурку “американка” стін на 3–26 поверхах виконано гідроізоляцію холодних переходів на 3–26 поверхах виконано влаштування плитки на 18–26 поверхах
Section 3.2
  • 95% completed work on the construction of the reinforced concrete frame of the house.
  • 30% completed work on the construction of external, internal walls and partitions made of bricks and aerated blocks.
  • November 2025. Installation of window structures is being performed on the 24th floor.
  • February 2026: Masonry work in the area of ​​cold transitions.
  • March 2026: Brickwork on cold transition areas is ongoing. Suspended platforms for facade works have been installed. 10% of the vapor barrier of external window installation joints has been completed. 5% of the facade insulation installation with doweling of the main field has already been completed.
  • May 2026: • Facade insulation completed — 500 m². • Facade reinforcement completed — 400 m². • Decorative plaster application completed — 700 m². • Facade painting completed — 400 m². • Plastering of common area walls from the 3rd to the 12th floor completed. • Floor screed installation completed from the 18th to the 23rd floor. • Installation of heating and water supply pipes from the 3rd to the 18th floor is ongoing.
  • June 2026: Façade: insulation — 1,450.00 m², reinforcement — 2,350.00 m², decorative plaster — 1,750.00 m², painting — 1,200.00 m². heating and water supply pipelines installed on Floors 3–26 sewer risers completed on Floors 3–12 water supply risers completed on Floors 3–10 apartment utility conduits installed on Floors 4–17 cement-sand screed completed on Floors 8–18
  • Лютий 2026: Виконання кладки на ділянці холодних переходів.
  • Березень 2026: - продовжується цегляна кладка на холодних переходах. - змонтовано колиски для виконання фасадних робіт. - на 10% виконано пароізоляцію зовнішніх монтажних швів вікон. - вже виконано 5% монтажу утеплювача з дюбелюванням основного поля фасаду.
  • Квітень 2026: - виконано утеплення фасаду 2080 м², армування 3035 м² та нанесення декоративної штукатурки 750 м². - виконано штукатурку стін МЗК з 12 по 26 поверх і влаштування стяжки підлоги з 24 по 26 поверх. - виконано розводку кабелів по поверхах з 4 по 9, прокладання гофрованих труб у підлогах з 4 по 26 поверх, а також монтаж труб опалення та водопостачання на поверхах з 18 по 26
  • Травень 2026: • Виконано утеплення фасаду — 500 м². • Армування фасаду — 400 м². • Нанесення декоративної штукатурки — 700 м². • Фарбування фасаду — 400 м². • Виконано штукатурення стін місць загального користування з 3 по 12 поверх. • Влаштовано стяжку підлоги з 18 по 23 поверх. • Триває монтаж труб опалення та водопостачання з 3 по 18 поверх.
  • Червень 2026: фасад: утеплення — 1450,00 м², армування — 2350,00 м², нанесення декоративної штукатурки — 1750,00 м², фарбування — 1200,00 м² змонтовано труби опалення та водопостачання на 3–26 поверхах виконано стояки каналізації на 3–12 поверхах виконано стояки водопроводу на 3–10 поверхах прокладено труби живлення квартир на 4–17 поверхах виконано цементно-піщану стяжку на 8–18 поверхах
Section 2.1
  • A tower crane is being installed.
  • May 2026: • Vertical structural elements of the 3rd LSB floor completed. • Reinforcement of the LSB floor slab above the 3rd floor is 60% complete.
  • June 2026: vertical elements of Floor 4 completed floor slab above Floor 4 completed
  • Травень 2026: • Виконано вертикальні елементи ЛСБ 3 поверху. • Армування плити перекриття ЛСБ над 3 поверхом виконано на 60%.
  • Червень 2026: виконано вертикальні елементи 4 поверху виконано плиту перекриття над 4 поверхом
Section 3.1
  • Completed 10th floor of the house's reinforced concrete frame.
  • November 2025. Monolithic Works: Vertical elements and the floor slab above the 25th floor have been completed.
  • Wall masonry (or walling/brickwork) on the 8th and 9th floors has been completed.
  • Wall masonry is continuing on the 10th and 11th floors.
  • February 2026: Work on the installation of window structures on the 5th, 6th and 7th floors has been completed. Wall masonry continues on the 11th and 12th floors. Installation of ventilation units is underway – 23 floors have been installed, installation of reinforced concrete stairs – 16 floors have been installed.
  • March 2026: Masonry of walls and partitions on the 11th floor has been completed; work continues on the 12th floor. Masonry from the 13th to the 17th floors has begun. Elevator equipment has been delivered.
  • May 2026: • Masonry work on the 20th floor completed. • Masonry work continued on the 14th, 15th, 17th, 21st, and 22nd floors. • Work commenced on the 23rd floor. • Window installation completed from the 9th to the 13th floor.
  • June 2026: masonry completed on Floors 14–19 and 21–23 masonry started on Floors 25–26 roof shaft masonry is nearing completion window installation completed up to Floor 16 roofing works have begun roofing felt vapour barrier completed to approximately 70%
  • Кінець грудня 2025: Продовжується мурування стін на 10-му та 11-му поверхах.
  • Лютий 2026: Виконано роботи з встановлення віконних конструкцій на 5, 6 і 7 поверхах. Продовжується мурування стін на 11 та 12 поверхах. Виконується монтаж вентиляційних блоків – змонтовано по 23 поверх, монтаж залізобетонних сходів – змонтовано по 16 поверх.
  • Березень 2026: - завершено мурування стін і перегородок на 11 поверсі, продовжують роботи на 12 поверсі. Розпочато мурування з 13 по 17 поверхи. - Отримано ліфтове обладнання.
  • Квітень 2026: - завершено мурування 13, 16, 18 та 19 поверхів, продовжено мурування на 14, 15, 17, 20, 21 і 22 поверхів. - завершено улаштування плити перекриття над 26 поверхом і розпочато виконання робіт з монолітного парапету.
  • Травень 2026: • Завершено мурування 20 поверху. • Продовжено мурування на 14, 15, 17, 21 та 22 поверхах. • Розпочато роботи на 23 поверсі. • Виконано монтаж вікон з 9 по 13 поверх.
  • Червень 2026: завершено мурування 14–19, 21–23 поверхів розпочато мурування 25–26 поверхів кладка шахт покрівлі — на завершальному етапі виконано монтаж вікон до 16 поверху розпочато влаштування покрівлі пароізоляційний шар із руберойду виконано приблизно на 70%
Section 2.2
  • Work is underway on the arrangement of vertical elements of the 1st floor (floor height 4.300 mm)
  • November 2025. Monolithic Works: Vertical elements and floor slabs above the 6th and 7th floors have been completed.
  • Vertical elements of the 8th floor have been completed.
  • Arrangement of the floor slab above the 8th floor is ongoing.
  • February 2026: Installation of ventilation units is underway – 3 floors have been installed.
  • March 2026: Monolithic works: the floor slab between the 12th and 13th floors and vertical structural elements have been completed. Installation of vertical elements of the 14th floor is ongoing. In total, 512 m³ of concrete were delivered and used during the month.
  • May 2026: • The floor slab above the 21st floor and the vertical structural elements of this level have been completed.
  • June 2026: structural concrete works for the vertical elements of Floor 25 completed floor slab above Floor 25 is 50% complete
  • Березень 2026: - монолітні роботи: виконано плиту перекриття над 12-13 поверхами і вертикальні елементи. Триває облаштування вертикальних елементів 14-го поверху. Всього за місяць було прийнято 512 м³ бетону.
  • Квітень 2026: - завершено улаштування плити перекриття над 19 поверхом та вертикальних елементів цього рівня, а також виконано вертикальні елементи 20 поверху. Наразі тривають роботи з улаштування плити перекриття над 20 поверхом.
  • Травень 2026: • Завершено влаштування плити перекриття над 21 поверхом та вертикальних елементів цього рівня.
  • Червень 2026: завершено монолітні роботи вертикальних елементів 25 поверху плиту перекриття над 25 поверхом виконано на 50%
Parking
  • May 2026: • Concrete blinding and foundation monolithic works have been completed.
  • June 2026: concreting of vertical structural elements has begun
  • Transformer Substation No. 2 excavation completed concrete blinding completed Podium (Section 3.2) excavation works have begun A total of 1,230 m³ of concrete was used on site in June.
2020
Серпень
Вересень
Жовтень
Листопад
Грудень
2021
Січень
Лютий
Березень
Квітень
Травень
Серпень
Вересень
Жовтень
Листопад
Грудень
2022
Січень
Лютий
Червень
Липень
Серпень
Вересень
Жовтень
Листопад
Грудень
2023
Лютий
Березень
Квітень
Травень
Червень
Липень
Серпень
Вересень
Жовтень
Листопад
Грудень
2024
Січень
Лютий
Березень
Квітень
Травень
Червень
Липень
Серпень
Вересень
Жовтень
Листопад
2025
Лютий
Березень
Червень
Липень
Вересень
Жовтень
Листопад
Грудень
2026
Січень
Лютий
Березень
Травень
Червень
Липень
The first stage of construction:
Sections 1.1 and 1.2 (16th floor)
  • Internal finishing works are in progress (doors, stair railings, etc.)
  • Завершается стяжка пола
  • В подвале проведены подготовительные работы для монтажа насосной станции и электрощитового оборудования
2020
Січень
Січень
Серпень
Вересень
Жовтень
Листопад
Грудень
2021
Січень
Лютий
Березень
Квітень
Травень
Червень
2022
Січень
Лютий
Липень
Дякуємо за заявку!
Ми зв'яжемося з вами найближчим часом